Example compliance scenario · Construction
A construction contractor running several sites
This is an example scenario, not a real client project. It is not legal advice; ask your legal counsel about your own situation.
Rules in scope
- OHS Law No. 6331
- Regulation on OHS in Construction Work
- KVKK
Short answer: For a construction contractor running several sites, the first rules for AI come from occupational safety and personal data. The Regulation on OHS in Construction Work requires a health and safety plan before work starts, and a coordinator when several employers share a site. AI makes it easier to keep that plan and subcontractors’ documents up to date; KVKK applies when site cameras and worker documents are processed.
The situation
A contractor is running four sites at once, a mix of housing and industrial buildings; on each site different subcontractors handle the electrical, mechanical and structural work. For every new tender the bid team compares specifications hundreds of pages long with past bids by hand. The OHS team collects subcontractors’ training certificates, risk assessments and medical reports by email; finding which ones are missing or expired takes days. Site managers want the existing cameras to flag missing protective equipment.
Which rule, which date?
| Topic | Rule | Date |
|---|---|---|
| Risk assessment and safety measures | Occupational Health and Safety Law No. 6331 | Today |
| A health and safety plan before construction starts; a coordinator when several employers share a site | Regulation on Occupational Health and Safety in Construction Work | Today |
| Personal data in worker documents and camera footage; medical reports are a special category | KVKK | Today |
Sources for the rules are at the end of this page; other dates are in the compliance calendar. These rules regulate occupational safety, not AI; here AI is the tool for tracking the evidence and the documents.
How we work
- Document and data map (2–3 weeks, regulatory scan): We write down the documents the health and safety plan needs, those that come from subcontractors and who may access which document. Special category data such as medical reports is kept separate.
- Subcontractor document tracking, proof of concept (6–8 weeks): We build a document processing pipeline that reads the person, the document type and the validity date from training records, certificates and risk assessments. The success criterion is field-level accuracy on a test set labelled by the OHS team; missing and expired documents are listed for the coordinator.
- Bid and specification assistant: A knowledge assistant that cites its sources across specifications, contracts and past bids; documents are read from the document management system (for example SharePoint or M-Files).
- Camera analytics (optional): A prototype that detects missing protective equipment without identifying anyone and alerts the site manager; the notice and retention rules are written first.
What you receive
- A document and access map; personal data and retention rules
- A subcontractor document tracking pipeline measured on a test set, and a list of missing documents
- A bid and specification assistant that cites its sources
- On request, a camera analytics prototype and a production decision report
Limits
The health and safety plan and the risk assessment themselves, the duties of the OHS specialist, the coordinator and the workplace physician, structural and design calculations and legal opinions are out of scope. We build the system that finds and tracks the documents feeding into this work; an authorized person always makes the final decision.
Sources
- Occupational Health and Safety Law No. 6331 — Mevzuat Bilgi Sistemi (Turkish)
- Regulation on Occupational Health and Safety in Construction Work — Lexpera (Turkish)
- Personal Data Protection Law No. 6698 — Mevzuat Bilgi Sistemi (Turkish)
Services used in this scenario
Frequently asked questions
Who is responsible for safety documents when subcontractors are on site?
Under the Regulation on OHS in Construction Work, if more than one employer or subcontractor works on the same site, the employer or the project owner appoints a health and safety coordinator; appointing a coordinator does not remove the employer's responsibility. We build the system that shows which subcontractor documents are missing or expiring; the coordinator and the employer make the decisions.
Can site cameras detect missing helmets and vests?
Yes, but because they monitor workers, KVKK applies: a legal basis, prior notice to workers, proportionality to the purpose and a retention period must be set. We suggest starting with a design that detects only missing protective equipment without identifying anyone; the site manager decides what to do about each alert.